Adams Avenue Sewer Replacement Project:
Posted 11/6/2020

The work to be done for the base bid, in general, consists of construction and installation of an 8-inch sanitary sewer line, sanitary sewer manholes, sanitary sewer cleanout, sewer lateral, pipe trenching, backfill and resurfacing. All work shall be performed in accordance with the applicable portions of the Selma-Kingsburg-Fowler County Sanitation District Standards and Specifications latest revision and herein specified.  Sealed bids will be received by the Selma-Kingsburg-Fowler County Sanitation District in their offices located at 11301 E. Conejo Avenue, Kingsburg, California 93631,
at any time prior to 2:00 pm on November 24th, 2020. 

Digital copies of the plans and specifications may be obtained by emailing the following information:
Company Name, Contact, mailing address, email, and telephone number to engineering@skfcsd.org.

Plans may also be inspected at the following locations:

Peters Engineering Group

862 Pollasky Avenue

Clovis, CA 93612

(559) 299-1544

Fresno Builders Exchange

1244 North Mariposa

Fresno, CA 93703

(559) 237-1831

Visalia Builders Exchange

PO Box 667

Visalia, CA 93279

(559) 732-4568

 



CONSTRUCTION PROJECTS – RFP/RFQ

Project Updates

The following information is provided to help keep you informed of upcoming projects that are taking place within the district. A detailed description and general scope of work entailed in each project is provided by clicking on each link.
_____________________________________________________________________________________________________________________

 

Sewer Improvement Logan/McCall and Floral/Chestnut

March 1st, 2021 – Notice of Proposed Award

Location of Sewer Improvements

 

 

District Lift Station Refurbishment D-4 18th Street (Project)

The Selma-Kingsburg-Fowler County Sanitation District (District) is soliciting Proposals from qualified engineering consulting firms (Consultant) to perform the design and construction management services for the District Lift Station Refurbishment D-4 18th Street (Project).  The lift station was built in the late 1940’s.  The concrete structure and block building are original to the lift station.  The Project includes the general refurbishment and upgrade of District Lift Station D-4, including replacement of the force main, removal of block structure, piping, installation of new electrical wiring, conduits, motor control center.

July 31, 2020 – Notice of Proposed Award: District Lift Station Refurbishment D-4 18th Street Project

 

Contact:  Veronica Cazares at vcazares@skfcsd.org or 559-897-6500 x230

Resolution 2014-14 (Bid Protest Procedures)

 

Completed Projects

McCall avenue sewer project completed as of October, 2019

Headworks Improvement and Effluent Pump Station Project

Click here for the PowerPoint presentation pdf.

DAFT Replacement Project